The board

Tasks, criteria and documents

Task types, fields, acceptance criteria, documents, comments, attachments, test cases and task keys.

Task types

Every task belongs to a repository and, optionally, a project (an initiative that groups the repositories shipping together). It is also one of three types:

TypeKey prefixWhat it is
taskT-Ordinary product work
bugB-A defect
analizA-An analysis

task and bug follow the same review chain (Code Review → QA → PM UAT). An analiz task is different in kind, not just in name: its deliverable is a set of documents attached to the task itself — a spec and an implementation plan — never a commit to the repository, because an analysis produces no diff. It's reviewed in the Analiz Review column, where a human reads the plan and either approves it (the architect then opens the implementation tasks the analysis called for) or rejects it (back to Need Revision for the architect to rework). Each implementation task opened from an approved analysis names that analysis with a derived_from relation — see Ordering and relations — which is how the developer picking it up reaches the specification: list_task_documents re-reads it at any point, and it's injected into every run on that task automatically.

Fields

FieldHolds
titleShort summary
descriptionProduct-level story: the user story, context, out-of-scope notes (markdown)
technical_descriptionTechnical detail: affected endpoints/files/schema, approach, constraints (markdown)
acceptance_criteriaThe checklist QA executes and PM UAT verifies — see below
prioritylow / medium / high / critical
assigneeThe agent responsible; setting it is what makes a task in a working column dispatch automatically
repositoryWhich codebase the work touches
projectWhich initiative (a group of repositories that ship together) the task belongs to
before_deployPre-deploy checklist (markdown) — posted as a comment automatically when a release is dispatched
after_deployPost-deploy steps (markdown) — posted automatically once the production deploy succeeds
rollback_planHow to undo the change if production breaks (markdown) — posted alongside the pre-deploy checklist

Keep description, technical description and acceptance criteria in their own fields. They're read for different purposes — a reviewer wants the technical detail, QA and PM UAT read only the criteria — and content pasted into the wrong one is content those readers never see.

before_deploy also carries a block TaskTrooper generates and keeps in sync on its own, fenced between <!-- tt:order --> markers, naming what this task ships after and what it's built after (from its relations — see Ordering and relations). Anything you write outside that fence is yours and survives regeneration.

Acceptance criteria and verdicts

Each criterion is one observable Given/When/Then statement. It has three possible states:

  • Open — not yet settled; this is what holds up a hand-off.
  • Completed — the implementer's own claim that it's satisfied.
  • Canceled — deliberately dropped from scope, with a reason recorded and posted as a comment. A cancelled criterion counts as settled but is never treated as met.

Completed is a claim, not a verdict. QA and PM UAT each record their own independent verdict on every criterion — approve or reject, with a mandatory note on a reject — and a criterion isn't truly accepted until every role that reviews it has signed off. The role is derived from which column the task is in when the verdict is recorded, never from what the agent calls itself. See Quality gates for exactly when this is enforced.

Task documents

Free-form markdown documents attached to a task, in position order — the only place an analiz task's spec and plan live. Any task can carry documents, not just analyses; they're a place to keep material too long or too structured for a comment.

Comments

A comment is for something that needs attention: a rejection and its reason, an error, a blocker, an unanswerable question, work that wasn't done. Everything that went smoothly is already visible in the column, the criteria, the pull request link and the run history, so a clean run doesn't add a comment repeating what those already say.

Attachments

Images or documents (up to 10 MB, common file types) linked to the task. They're for reference — screenshots, specs, mockups — and are not fed into an agent's context automatically the way task documents are.

Test cases

QA's test round lives on the card as its own list, separate from the acceptance criteria. Each case has a title, a category (happy path, boundary, negative, auth, empty state, regression, visual, async, other), a status (planned, passed, failed, skipped, invalid), expected/actual results, evidence and notes, and optionally links back to the acceptance criterion it covers. A task can't move forward out of Ready for QA / In QA with no cases recorded, or with any case still planned.

Editing fields

Every text field follows the same rule when you update a task: leaving a field out of the update leaves its stored value alone, sending an explicit empty value clears it. The one exception is the assignee, which reads three ways — omitted leaves whoever is on the card, an explicit "unassign" clears it, and a value assigns that agent — because a plain empty string and "don't change this" needed to mean different things once the UI grew a button for each.

Runs history

Every headless agent run a task has had — which agent, when, what it did, how it ended — is listed on the task, each with its own activity stream you can open to see the tool calls that made it up. A run can be stopped or re-run from there without moving the card.

Task keys

Every task gets a short key — T-1, B-1, A-1 — built from its type's letter prefix and a number that counts up on its own for that type, so the three sequences never interleave (the first bug is always B-1, regardless of how many tasks or analyses came before it). The key is what you'll see quoted in chat, in a commit trailer, or in a branch name (feature/t-12), and it's stable for the task's whole life — reading a key back always tells you the type without opening the task. Numbers are never reused, even if a task is deleted, so a key always points at exactly one task for as long as the board exists.

Deleting a task

A task can be deleted permanently, along with its comments, criteria, documents and relations — there's no soft-delete state to recover from later. It's restricted to a task still in Backlog or Todo; once work has started elsewhere, deleting it is refused unless you explicitly force it, and a reason can be recorded as the last trace once the row itself is gone.

This restriction exists for the same reason moving a task backward is always allowed but deleting one further along is not: work already done — a branch, a pull request, review history — is worth keeping a record of even when the task itself was a mistake. Moving it to Need Revision or closing it out with a comment explaining why preserves that history; deleting it does not.